Skip to content

The Standards Council of Canada requires all proposed standards be made available for a 60-day public review during the development process, allowing input from interested parties.

These documents are issued for the purpose of generating critical review and comment. The application of material contained in these documents for other purposes, such as its use in judging a product for compliance with current requirements or determining future product needs, would be premature and could be misleading.

To obtain copies of these documents, please contact:
Standards Operations Manager: Brian Murphy
E-mail: Brian.P.Murphy@ul.com
Phone: 613-755-2729 (61421)
Fax: 613-231-5977

Address: ULC Standards
171 Nepean Street, Suite 400, Ottawa, ON, K2P 0B4

The Proposed Joint Standard of the First Edition ANSI/CAN/UL/ULC-1316, Standard for Fibre Reinforced Plastic Underground Tanks For Flammable and Combustible Liquids, has been submitted to the Joint UL/ULC Technical Committee on Flammable and Combustible Liquid Underground Tanks for letter ballot approval and to others interested for comment.

Date Posted: 2018/January/19
Date Due: 2018/March/19

The Proposed Reaffirmation of the First Edition ANSI/CAN/UL/ULC-8752, Standard for Organic Light Emitting Diode (OLED) Panels, has been submitted to the Joint UL/ULC Technical Committee on Solid State Lighting for letter ballot approval and to others interested for comment.

Date Posted: 2018/January/25
Date Due: 2018/March/26

The Proposed Reaffirmation of the First Edition ANSI/CAN/UL/ULC-8753, Standard for Field-Replaceable Light Emitting Diode (LED) Engines, has been submitted to the Joint UL/ULC Technical Committee on Field-Replaceable LED Light Engines for letter ballot approval and to others interested for comment.

Date Posted: 2018/January/25
Date Due: 2018/March/26

The Proposed Revisions of the CAN/ULC-S1088, Standard for Temporary Lighting Strings have been submitted to the Standards Technical Panel ULC on Temporary Lighting Strings for letter ballot approval and to others interested for comment.

Date Posted: 2018/February/21
Date Due: 2018/April/22

The Proposed Second Edition of CAN/ULC-S610, Standard for Factory-Built Fireplace Systems is available to the public for comment.

Date Posted: 2018/February/22
Date Due: 2018/April/23

The Proposed Revisions of the Third Edition of CAN/ULC-S139, Standard for Fire Test for Circuit Integrity of Fire-Resistive Power, Instrumentation, Control and Data Cables, has been submitted to the ULC Standards Committee on Fire Tests for letter ballot approval and to others interested for comment.

Date Posted: 2018/February/23
Date Due: 2018/April/24

The Reaffirmation of the Second Edition of CAN/ULC-S518, Standard for Cotton-Synthetic Non-Percolating Forestry Hose, has been submitted to the ULC Standards Committee on Fire Protection Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/February/26
Date Due: 2018/April/26

The Reaffirmation of the Second Edition of CAN/ULC-S518.1, Standard for Synthetic Non-Percolating Forestry Hose, has been submitted to the ULC Standards Committee on Fire Protection Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/February/26
Date Due: 2018/April/26

The Proposed First Edition of CAN/ULC-S146, Standard Method Of Test For The Evaluation Of Encapsulation Materials And Assemblies Of Materials For The Protection Of Structural Timber Elements, has been submitted to the ULC Standards Committee on Fire Tests for letter ballot approval and to others interested for comment.

Date Posted: 2018/February/28
Date Due: 2018/April/30

The Proposed Reaffirmation of the First Edition ANSI/CAN/UL/ULC-8754, Standard for Holders, Bases, and Connectors for Solid-State (LED) Light Engines and Arrays, has been submitted to the Joint UL/ULC Technical Committee on Field-Replaceable LED Light Engines for letter ballot approval and to others interested for comment.

Date Posted: 2018/March/06
Date Due: 2018/May/05

The Proposed Reaffirmation of the First Edition ANSI/CAN/UL/ULC-2577, Standard for Suspended Ceiling Power Grid Systems and Equipment, has been submitted to the Joint UL/ULC Technical Committee on Solid State Lighting for letter ballot approval and to others interested for comment.

Date Posted: 2018/March/06
Date Due: 2018/May/05

The Proposed First Edition CAN/ULC-S590, Design, Installation, Inspection, Testing and Maintenance of Safety Way Guidance Systems, has been submitted to the ULC Standards Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/March/13
Date Due: 2018/April/27

The Proposed Fourth Edition CAN/ULC-S706.1, Standard for Wood Fibre Insulating Boards for Buildings, has been submitted to the ULC Standards Committee on Thermal Insulation Materials and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/April/11
Date Due: 2018/June/11

The Proposed First Edition ANSI/CAN/UL/ULC 1369, Standard for Aboveground Piping for Flammable and Combustible Liquids, has been submitted to the Joint UL/ULC Technical Committee on Flammable and Combustible Liquids Piping for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/4
Date Due: 2018/July/3

The Proposed Reaffirmation of the Fifth Edition CAN/ULC-S111-13, Standard Method of Fire Tests for Air Filter Units, has been submitted to the ULC Technical Committee on Fire Tests for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/18
Date Due: 2018/July/17

The Proposed Reaffirmation of the Third Edition CAN/ULC-S551-13, Standard for Forged External-Lug Quick-Connect Couplings and Adapters for Forestry Fire Hose, has been submitted to the ULC Technical Committee on Fire Protection Equipment for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/18
Date Due: 2018/July/18

The Proposed Reaffirmation of the Second Edition CAN/ULC-S558-13, Standard for External-Lug Quick-Connect Couplings and Adapters for Forestry Fire Hose, has been submitted to the ULC Technical Committee on Fire Protection Equipment for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/18
Date Due: 2018/July/18

The Proposed Reaffirmation of the First Edition CAN/ULC-S574-13, Standard for Forged 65 mm (2½ in) External Lug Quick-Connect Couplings and Adapters for Forestry Fire Hose, has been submitted to the ULC Technical Committee on Fire Protection Equipment for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/18
Date Due: 2018/July/18

The Proposed Reaffirmation of the Fifth Edition CAN/ULC-S536-13, Standard for Inspection and Testing of Fire Alarm Systems, has been submitted to the ULC Technical Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/18
Date Due: 2018/July/18

The Proposed Reaffirmation of the Fifth Edition CAN/ULC-S537-13, Standard for Verification of Fire Alarm Systems, has been submitted to the ULC Technical Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/18
Date Due: 2018/July/18

The Proposed Reaffirmation of the Second Edition CAN/ULC-S559-13, Standard for Equipment for Fire Signal Receiving Centres, has been submitted to the ULC Technical Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/18
Date Due: 2018/July/18

The Proposed Reaffirmation of the Second Edition CAN/ULC-S561-13, Standard for Installation and Services for Fire Signal Receiving Centres, has been submitted to the ULC Technical Committee on Fire Alarm and Life Safety Equipment and Systems for letter ballot approval and to others interested for comment.

Date Posted: 2018/May/18
Date Due: 2018/July/18